top of page
Inline Logo

Case Study: Double-Storey Fit-Out for Product Showcase

Hillhead Trade Show, 2024

​

Inline was appointed to deliver a full internal fit-out for a prominent industrial equipment manufacturer exhibiting at the 2024 Hillhead Trade Show - the UK’s largest quarrying, construction, and recycling exhibition.

​

The project involved a complete tack-off installation across a double-storey temporary structure, designed to create a premium environment for showcasing heavy equipment and engaging with industry professionals.

​

Working closely with the client, our team translated a complex design concept into a fully realised space, ensuring every element was installed to the highest standard and aligned with brand expectations.

​

As with many live exhibition environments, success depended on seamless integration between multiple teams. Inline coordinated effectively with other trades, graphic installers, and production crews to deliver a smooth, on-time installation that was ultimately met with excellent client feedback.

​

This case study demonstrates Inline’s ability to execute high-spec fit-outs for large-scale trade events - combining precision, flexibility, and collaborative project management.

© 2025 Inline Projects Ltd

bottom of page